|
|
|||
|
|
LS - 1 Dual Row Timing Chain
Requires a special ARE pan because the stock oil pump is spaced forward ( shims shown) 3 mm We machine the oil pump supply tube bore in the pan forward 3mm to compensate Add "DRC" after the pan part number to indicate this set-up Part No 5024 - Net $179.00 Pan Modifications - $64.00 |
||
|
|
|||
| LS1-7 Directory | |||
| Chevrolet & GM | |||
| Ford | |||
| European | |||
| Japanese | |||
|
|
|||
| Valve Covers | |||
|
|
|||
| Oil Pumps | |||
|
|
|||
| ARE Billet Adapters | |||
| Pressure Regulated Adpt | |||
|
|
|||
| LS Tanks | |||
| 1-5 Gallon Tanks | |||
| Catch Cans | |||
| Tank Accessories | |||
|
|
|||
| ARE Drive Components | |||
| Pump/Drive Gallery | |||
| ATI Dampers | |||
| Fittings | |||
| Merlin/Dart Front Covers | |||
| Setrab Coolers | |||
| Vintage Air | |||
|
|
|||
| About ARE | |||
| Company Profile | |||
| Disclaimer | |||
| Distributors | |||
| Specialized Products | |||
| Patents | |||
| Price List | |||
| Catalog | |||
| Contact ARE | |||
|
|
|||
| Technical Explanation | |||
| Why Cast | |||
| Dry Sump Instructions | |||
| LS Plumbing Schematics | |||
| LS7 Z06 Installation | |||
| LS1-6 Installation | |||
|
|
|||
| LS Customer Gallery | |||
| ARE Equipped Gallery | |||
| ARE in Action | |||
| Tradeshows | |||
|
|
|||